Title
UPTOWN FULLERTON CHANNEL EMERGENCY REPAIR
Recommendation
Proposed Motion:
1. Ratify the selection of KEC Engineering to provide materials and services for Uptown Fullerton Channel emergency repairs, waiving formal bidding procedures.
2. Approve $150,000 Drainage Capital Outlay Funds (Fund 74) budget transfer and appropriation from Project 52591 Annual Storm Drain Repair to Project 52023 Uptown Fullerton Channel Repair within the Drainage Capital Outlay Fund (Fund 74).
3. Authorize Public Works Director, or designee, to approve change orders for construction and professional engineering construction support services within the approved project budget.